Open Access Tariff Calculator
⬇️ injection → drawl
inj state
Gujarat
Rajasthan
Maharashtra
inj level
CTU
STU
drawl state
Gujarat
Maharashtra
Rajasthan
drawl level
CTU
STU
kV
11
33
132
duration
LTOA
STOA
mode
captive
3rd
connect MW
📊 tariff & generation
ex‑bus ₹/kWh
banked %
fuel
Solar
Wind
capacity MW
CUF %
calculate
Gujarat → Maharashtra
edit
gen
634
MWh
lost
20.3
MWh
recv
614
MWh
trans (₹/kWh)
STU ch
0.252
STU loss
0.50%
CTU ch
0.405
CTU loss
2.50%
distrib
wheel ch
0.315
wheel loss
0.70%
CSS
0.00
add sur
0.00
other
banking
0.00
LDC
0.07
duty
0.05
⚡ captive → CSS=0, RE exemption 10%
savings estimate
show
⬇️ 1.87 ₹/kWh